Skip to content

NYS Clean Heat Programs

NYS Clean Heat, Con Edison and PSEG Program Information

NYS Clean Heat - General Information

FOR HOME OWNERS

Learn More About the Clean Heat Program and how ground source heat pumps (Geothermal) can offer a convenient and effective heat and cooling solution for year-round home comfort.

CLICK HERE to discover learn about rebates and incentives through the Inflation Reduction Act, NYSERDA and your Utility.

FOR CONTRACTORS

If your work involves the installation or design of ground source heat pumps, or if you are a geothermal heat pump driller, we would like to invite you to join the NYS Clean Heat Participating Contractor network.

Manual Update 9.1.26

NYS-Clean-Heat-Program-Manual V3 9.1.26

A brief overview of the major changes is included below:

  • New fossil fuel equipment may not be installed with an eligible heat pump.
  • A new Weatherized Tier is now effective, as of September 1, 2026.
  • Customers can qualify through three pathways: (1) a "Post-2010 Build/Modern Home Pathway"; (2) a "Past Participation Pathway" and; (3) a "Performance Pathway". Please see the Program Manual for further details and incentive levels.
  • Incentive levels have been updated to reflect new amounts, including incentives for weatherized and non-weatherized projects, new amounts for HPWH, and Limited-Time Offers for HPWH.
  • The Program Administrators have updated definitions and eligibility scenarios for apartments, mixed-use buildings, secondary structures, bulk developments of new construction housing, and manufactured homes.
  • Open loop systems will be considered for eligibility on a case-by-case basis in upstate service territories starting September 1, 2026. To submit a project for consideration, please inquire with your utility program administrator.
  • The Program will require heat pump systems to be sized for the full load of the home. Electric resistance will be allowed only as a backup outside of normal operations through physical or digital controls. Previously, residential projects in Categories 2b, 3, and 4 were allowed to include electric resistance heating not to exceed 10% of BHL.
  • Con Edison will implement an additional service adequacy check, effective September 1, 2026, when confirming customer eligibility onĀ conedeligibility.com.
  • New language has been added to describe the contractor allocation method used by Con Edison and National Grid.
Scroll To Top